I've read on another thread elsewhere about how well the uphill shutdown area at Bandimere and at the Strip at Las Vegas area works. As of now, Z-Max dragway in Charlotte and the supposed relocation of the dragstrip in Seattle are the only tracks that are under construction. Since these are both works in process, wouldn't it be a good idea to make the shutdown area into a much steeper uphill grade than the plans currently are?
If this would work better for slowing the cars down after the finish line then other tracks could look at what it takes to do this in the future.
If this would work better for slowing the cars down after the finish line then other tracks could look at what it takes to do this in the future.